Project

Critical LCO (Light Cycle Oil) Storage Tanks / EPC

Engineering, procurement, construction, pre-commissioning, commissioning, testing, integration, and handover of two new light cycle oil (LCO) storage tanks at HAOR. The facility includes two fixed-roof LCO tanks, each with a net working capacity of 5,000 m³, together with a closed drain drum, closed drain pit ejector, pump house, pumps, piping tie-ins, electrical, instrumentation and automation systems, civil works, fire and gas and firefighting systems, roads, drainage, and connections to existing refinery utilities.