Project

Gas compressor station No. 1

The gas compressor station was constructed in 2012 on the Gunashli Deepwater Platform No. 4 in the Caspian Sea. The station collects low-pressure gases generated during the oil extraction process and transports the collected gases to the suction system of BCS-2 at Oily Rocks. The facility consists of two Siemens SGT400 twin-shaft gas turbine compressor drivers, two Siemens STC-SH gas compressor units, and two Siemens STC-SV gas compressor units.