Project
HAOR substation buildings
Construction and completion of three substation buildings. Construction, piping, painting, and insulation works were carried out, with a total construction area of 5,142 m².
Construction and completion of three substation buildings. Construction, piping, painting, and insulation works were carried out, with a total construction area of 5,142 m².