Project
SOCAR HAOR Tank Erection | Package A
Installation, insulation, painting, and hydrotesting services for six process tanks (480 tons) under Package A of the SOCAR HAOR Modernization and Reconstruction Project.
Volume of works
| № | Item No. | Description | Applied Code | Tank Type | I.D (m) | H (m) |
|---|---|---|---|---|---|---|
| 1 | 41-T-401 | AMINE STORAGE TANK | API 650 | CRT | 2.4 | 4.88 |
| 2 | 41-T-501 | SULPHUR TANK | API 650 | CRT | 6.1 | 7.13 |
| 3 | 44-T-001A | Sour Water Equalization Tank | API 650 | CRT | 16 | 17.1 |
| 4 | 44-T-001B | Sour Water Equalization Tank | API 650 | CRT | 16 | 17.1 |
| 5 | 56-T-001 | Slop Tank | API 650 | CRT | 6.3 | 7 |
| 6 | 56-T-401 | Methanol Storage Tank | API 650 | CRT | 12 | 11 |