Project

SOCAR HAOR unit 62 & unit 71 tank engineering, procurement, fabrication and erection

Prokon is carrying out engineering and design works for two process tanks (530 tons) in Block 62 and nine process tanks (1,070 tons) in Block 71 as part of the SOCAR HAOR Modernization and Reconstruction Project. The scope includes material supply, fabrication, installation, insulation, sealing, testing, and commissioning works.