AZERKIMYA Steam To Power
Client: SOCAR Uniper
Location: Sumgayit, Azerbaijan
Start date: July 2019
Scope of work: Construction works of switchgear building, steam turbine building and air-cooled condensed building, equipment and pipeline installation works around buildings and landscaping works in the unit.
Disciplines: Civil, piping, structural steel, painting/insulation, equipment erection, electrical and instrumentation.
Volume of works:
| Excavation | 320m3 |
| Backfilling | 550m3 |
| Concrete | 1,600m3 |
| Structural Steel Erection | 600Ton |
| Piping Works | 15,000WDI |
| Equipment Erection Works | 451Ton |
| E & I Cable Pulling Works | 378km |