AZERKIMYA Steam To Power
Client: SOCAR Uniper
Location: Sumgayit, Azerbaijan
Start date: July 2019
Scope of work: Construction works of switchgear building, steam turbine building and air-cooled condensed building, equipment and pipeline installation works around buildings and landscaping works in the unit.
Disciplines: Civil, piping, structural steel, painting/insulation, equipment erection, electrical and instrumentation.
Volume of works:
Excavation | 320m3 |
Backfilling | 550m3 |
Concrete | 1,600m3 |
Structural Steel Erection | 600Ton |
Piping Works | 15,000WDI |
Equipment Erection Works | 451Ton |
E & I Cable Pulling Works | 378km |
AZERKIMYA Steam To Power
![](/uploads/f82526d8-18fb-41c2-adf5-b89e577e9720_IMG_20201119_091925-(2).jpg)
![](/uploads/be9a7a19-a5a5-4c1a-a895-0a22db5275f7_1524.jpg)
![](/uploads/e70f6aec-5b34-4713-b07a-d1cab968f0a6_1534.jpg)
![](/uploads/8ca3803b-0521-4f6b-ae22-612e6d87575d_IMG_20200914_151424---Copy.jpg)
![](/uploads/35b07032-67c1-418b-a72b-c3f5131b7c6a_uniper.jpg)
See all ![](/img/Vector (10).svg)