Gas lift compressor station No 2
Client: Azneft PU
Location: Oil Rocks, 28 May platform
General information: The existing compressor station at Oil Rocks is designed to transport natural gas from Chirag and Gunashli fields to Bakhar field through a subsea pipeline. The booster compressor station #2 operated by 28 May Oil and Gas Production Division (OGDP) has twelve (12) T-4702 type gas turbine engine driven compressor units and auxiliary equipment.
Completion date: March 2010
Capacity of compressors: Maximum one compressor capacity - 1,8 million m3/day (20°C 1013 hPa); maximum two compressor capacity - 3,6 million m3/day (20°C 1013 hPa)
Design conditions applied:
Design Pressure
Gas pressure at the compressor inlet of 1st stage 4,5-6 barg (20°C)
1st stage outlet pressure 17-20 barg
2nd stage inlet pressure 15,8-18,8 barg
2nd stage outlet pressure 35-58 barg
Station Outlet 65,5 barg
Design Temperature
Station inlet gas temperature +5; +25°C
1st stage compressor inlet temperature 20°C
Maximum after 1st stage cooler gas temperature
(at 36°C environmental temperature) 45°C
Maximum after 2nd stage cooler gas temperature (at 36°C environmental temperature) 45°C
Gas lift compressor station No 2